UP, scheduling unit in Spain

Curtailment & Congestion Updated: 2026-11-20

A unidad de programación, abbreviated UP, is the scheduling unit used in Spain's system-operation structure to identify an energy program and related operating information. It provides the program-level reference through which the operator represents generation or acquisition of energy. The relationship between UPs, physical units and programs is described in P.O. 3.1 and its operating-procedure framework.

Scheduling level and physical level

A UP and a physical unit, or UF, answer different questions. The UP identifies the scheduling level, while the UF provides the physical breakdown used in the corresponding registration and information exchanges. The permitted composition follows the applicable rules; it should not be inferred simply from common ownership or proximity.

As a synthetic example, two eligible physical units may contribute 20 MW and 10 MW to a 30 MW UP program for an interval. A limit on one of those UFs is not automatically a limit of the same amount on every other unit represented by the UP. The effective mapping and the relevant version of the program are needed to interpret the action.

Using UP data

Restriction data can refer to a UP, a specific UF or a program that is later revised. Joining datasets therefore requires consistent unit identifiers, delivery intervals, effective dates and program stages. A UP code is not itself a geographic coordinate, a grid-access permission or a measure of installed capacity.

Before comparing energy, identify whether the reference is the PDBF, PDVP or P48. The Explore on Spanish restriction codes explains why that context matters when moving from a record to a project assessment.