SCA, overload under a contingency in Spain
SCA is a cause code used in Red Eléctrica's technical-restriction reporting for an overload identified under a contingency. It distinguishes a security concern in an assessed outage state from an overload already present in the base case, which is labeled SCB in the same reporting context. The terminology appears in the REE restriction-code legend.
Engineering meaning
When a line, transformer or another modeled element becomes unavailable, power redistributes through the remaining network. A monitored branch can then exceed the limit applicable to that contingency state even though its base-case loading is acceptable. The affected branch and the element whose outage is being assessed can be different assets.
For example, assume a branch carries 80 MVA in the base case and 125 MVA after a specified line outage, with an applicable limit of 100 MVA in each state. The contingency creates the overload in this illustrative case. These values are synthetic and do not identify a real REE event or a calculated redispatch requirement.
Interpreting a published record
An SCA label can support a preventive schedule change before the modeled outage occurs. Consequently, the code does not prove that a line tripped or that equipment was actually operated above its limit. Read it alongside the unit, time interval, direction, process and available information about the limiting network condition.
For a renewable project, an associated downward generation adjustment may warrant investigation of curtailment exposure. Its energy and financial effect still depend on the reference schedule, available production and settlement. A code alone does not establish an annual loss rate or the capacity available for a new connection.
Continue with the Explore on Spanish restriction codes for the comparison with SCB and EST. Related concepts include contingency analysis, the N-1 criterion and thermal limits.