ERNI, non-integrable renewable energy in Spain

Curtailment & Congestion Updated: 2026-11-20

ERNI means energía renovable no integrable, or non-integrable renewable energy. Its interpretation depends on the publication and calculation method. In REE's August 2025 nodal ERNI report, it is an estimate associated with maximum program limitations imposed in Phase 1 of the day-ahead technical-restriction process, relative to the relevant PDBF program.

The methodology distinguishes limits applied to a scheduling unit from limits applied to its physical units. It also defines the renewable technologies included. This nodal estimate therefore has a specific program reference, process stage and technology coverage. It should not be relabeled as every form of renewable production lost in real time.

Reading a nodal percentage

The report presents percentages with different denominators. A node's ERNI can be expressed relative to the renewable PDBF at that node or relative to the peninsular renewable PDBF. These answer different questions about local exposure and contribution to the system total.

In a synthetic example, 10 GWh of ERNI divided by 100 GWh of nodal renewable PDBF gives 10%. The same 10 GWh divided by 1,000 GWh of peninsular renewable PDBF gives 1%. Neither percentage can be interpreted without its denominator. These numbers illustrate the calculation and are not REE observations.

Use in project screening

Historical nodal ERNI can help identify locations for further investigation. It does not directly provide a new project's future curtailment probability, lost revenue or available grid-access capacity. REE also notes that the nodal aggregate need not match its separate monthly aggregate indicator.

The curtailment Explore page connects the energy concept to project assessment. The Spanish restriction-code Explore page explains why a cause label, program reduction and physical loss require separate interpretation.